Braced Footing (Late May 2002)

This is how I braced the sonatubes before and after pouring the footings. I sometimes had 2-3 footings in various stages of preparation, pouring, or curing. I left the braces on for at least a week during curing.

Previous Home Next

20020528-01_Deck_Footing_3