Braced and Poured Outer Footing (Early July 2002)

Here is one of the outer footings, poured and curing. The embedded 5/8ths bolt for attaching the metal post foot is easily seen. It has a black plastic cap over the threads to keep them clear of concrete.

Previous Home Next

20020704-04_Poured_Footing_curing